Abatement Demolition Project: North Eugene High School
Project Name: North Eugene High School
Job Number: 3130-23
Project Dates: January 2024 – April 2024
Contract Price: $1,268,620
Project Location: 200 Silver Lane Eugene OR 97404
Owner: 4J School District
Scope of work: Full abatement throughout the building, removal of flooring, gypsum board/ joint compound, doors, ceilings, along with some selected demolition.
Project description: Originally built in 1956 the original N Eugene high school would be getting fully demoted. The 4J school district came to the determination in Spring 2023, The original high school contained various hazardous materials that would be removed by PMG.