Higher Education

Abatement Demolition Project: U of O Villard Hall

2025-05-24T09:38:07-07:00

Abatement Demolition Project: U of O Villard Hall Client: University of Oregon Scope of work: Abatement consisted of asbestos throughout the building, including floor tile, gypsum board/ joint compound, pipe insulation, and fire doors. Demolition of the third floor ceiling, and cleaning/disinfecting of rodent and bit feces within the attic. Project [...]

University Abatement Project: U of O Innovation- Portland

2025-05-24T09:38:46-07:00

University Abatement Project: U of O Innovation- Portland Client: University of Oregon Scope of work: Abatement throughout building, scope of work consisted flooring, windows, gyp, along with removal of all asbestos containing materials. Project description: Built in 1947, 47,000 square feet and three levels. Once was Concordia University, newly bought by [...]

Timberline Lodge

2025-05-24T09:39:25-07:00

Commercial Abatement Demolition Project: Timberline Lodge Client: Artis Construction Scope of work: Project consisted of abatement removal, along with demolition. Abatement and demo was within a confined space, removal of pipe insulation running from boiler room through den, elevator tunnel, lodge and maintenance shop. Project description: Timberline Lodge is a National [...]

Portland Community College Sylvania, Portland, Oregon

2025-04-04T11:23:13-07:00

Portland Community College Sylvania, Portland, Oregon Client: Fortis Construction Scope of Work: PMG provided Abatement, and Structural demolition services in Portland, Oregon. Large structural demolition of lap pool, along with the dive pool. PMG’s team worked on removing a structural waffle deck. Project Description: PCC Sylvania's health technology building built [...]

North Eugene High School, Eugene Oregon

2025-05-16T11:31:26-07:00

Abatement & Demolition Project: North Eugene High School, Eugene Oregon Client: 4J School District Scope of Work: PMG provided abatement and demolition services for 4J School district. Full abatement throughout the building, removal of flooring, gypsum board/ joint compound, doors, ceilings, along with some selected demolition. Project Description: Originally built [...]

Klamath Hall 3rd Floor

2025-05-16T11:50:09-07:00

Higher Education Project: Klamath Hall 3rd Floor Project: Klamath Hall 3rd Floor Scope: 2134 SF/LF of pipe insulation, hard fittings, valve packing, mastic, CAB, and selective demo of ductwork Description: In 1967 the building was originally opened and called Science II, in 1990 the building was renamed Klamath Hall after [...]

Arts & Communication Magnet Academy Exterior

2025-05-16T12:28:58-07:00

Abatement Project: Arts & Communication Magnet Academy Exterior Project: Arts & Communication Magnet Academy  Scope: 15,000 SF floor tile/mastic located throughout school, black sink under coating insulation, fire doors, and mirror mastic, 10,000 LF pipe insulation and hard fittings, window glazing compound located in various locations Description: The Arts & [...]

Go to Top